Wednesday, September 8

Duty Roster, Stardate 56686

ENSIGN PICO, Norvo -- Weeks Duty Roster

Thursday - SD 56687
  • 1200 hours: Deflector Control Room, manager. Run standard diagnostics on Deflector dish, deflector control relays, particle emitter, collimator, and induction stabilizer. Relieved by Crewman Bon'tcha, 1600 hours.
  • 1630 hours: EPS Relay Maintenance, Main Engineering. Report to Assistant Chief Engineer Lieutenant N'Zhareen. End shift 1900.
Friday - SD 56688
  • 1200 hours: Main Armory, level 1 diagnostics on weapon analysis computer and hand-weapons computer. 1330: Assist in weapons modification and upgrades. Relieved 1430.
  • 1500 hours: Computer Core Control: Shipwide computer diagnostics. End shift 1830.
  • 1930 hours: ODN Maintenance: Standard diagnostics. End shift 2300.
Saturday - SD56689
  • 0800 hours: Deflector Control Room, manager. Standard diagnostics, power utilization analysis. 1230 relieved.
  • 1300 hours: EPS Relay Maintenance, Main Engineering. Report to Assistant Chief Engineer Lieutenant N'Zhareen. End shift 1730.
Sunday - SD 56690
  • 2330 hours: Night Bridge shift, Operations Officer. Relieved 0600 hours.

No comments:

Post a Comment