Monday, July 5

Weekly Diagnostic Report

FROM: Ensign Norvo Pico
TO: Lieutenant Zot, Operations Officer
PRESENTED: Stardate 56508.73

Deflector Array: Level 1 diagnostic performed SD 56504.38. All systems operating within normal parameters.

Computer Core/Operations Interface: Level 1 diagnostic performed SD 56500.38. All systems operating within normal parameters.

Communications Systems: Level 1 diagnostic performed SD 56499.81. All systems operating within normal parameters.
  • Chronometer: Synchronized with Federation Timebase Beacons 14 at Cestus III and 38 at Starbase 51. No significant time variation detected.

Transtator assembly: Level 2 diagnostic performed SD 56505.38. All systems operating within normal parameters. (EXPANDED)
  • Primary Transtator Circuit: Level 1 diagnostic performed SD 56487.9. Minor calibration to primary transtator output frequency monitor required; performed. All systems operating within normal parameters.
  • Transtator Relay to Bridge: Level 1 diagnostic performed SD 56489.4. All systems operating within normal parameters.
  • Primary Transtator Relay to Main Engineering: Level 1 diagnostic performed SD 56455.9. All systems operating within normal parameters.
  • Secondary Transtator Relay to Main Engineering: Level 1 diagnostic performed SD 56456.2. Minor calibration to output frequency required; performed. All systems operating within normal parameters.
  • Shipwide Transtator Interface: Level 1 diagnostic performed SD 56500.2. All systems operating within normal parameters.
Sensor Array: Level 2 diagnostic performed SD 56504.38. All systems operating within normal parameters. (EXPANDED)
  • Navigational Sensors: Level 1 diagnostic performed SD 56508.00. 8 micron misalignment detected in secondary CONN interface controls; repair request sent to Main Engineering 56508.15; repair expected by 56508.8. [NOTE: Navigational sensor diagnostic was originally planned for SD 56498.5, post-poned by CONN officer until we entered orbit of destination Cestus III.]
  • Short Range Sensors: Level 2 diagnostic performed SD 56507.50. Minor fluctuations detected from starboard sensor grid; repair request sent to Main Engineering 56507.61; repair completed 56508.5. All systems operating within normal parameters.
  • Long Range Sensors: Level 1 diagnostic performed SD 56504.03. Minor fluctuation detected from planetary imaging sensor; repair request sent to Main Engineering 56504.22; repair completed 56504.93. All systems operating within normal parameters.
  • Lateral Sensor Array: Level 3 diagnostic performed SD 56508.01. All systems operating within normal parameters. Level 1 diagnostic scheduled for SD 56514.9, upon arrival at Starbase 44. [NOTE: Science Department has had Lateral Sensor Array in full use for the entirety of this Diagnostic Reports' timeframe. Next available opening for Level 1 diagnostic is at Starbase.]
  • Torque Sensors: Level 1 diagnostic performed SD 56500.1. 18 micron misalignment detected; fully realigned. All systems operating within normal parameters.

No comments:

Post a Comment